What are we doing?
Widening Ron’s River Trail from ~Orange Street to ~Bess Reed Park
Enhancing the access to the Riverfront Trail at Ryman Street, Pattee Street, and Kiwanis Park
Constructing a new ADA-compliant ramp on the Northeast side of Beartracks Bridge down to the Riverfront Trail
When are we doing it?
Current stage: DESIGN
currently at a 60% level of detail.
expecting to reach 100% design in Summer 2026.
Construction: TBD
Start of construction: TBD, potentially Fall 2026
Why are we doing it?
The Riverfront Trail and Connectivity Improvements project element enhances safety, access, and mobility along one of Missoula’s most popular corridors. These improvements strengthen multimodal connections between Downtown and the Riverfront Trail system by creating a safer and more accessible experience for all users.
How will this change enhance Downtown Missoula?
SAFETY: Reducing the risk of crashes and increasing the level of comfort for all users traveling to and within downtown.
The extra width will provide more space and comfort for trail users.
The project will add updated trail lighting to improve visibility.
ACCESS: The ease with which people can reach desired goods, services, activities, and destinations using a variety of transportation modes
The trail at the end of Pattee Street leading to the Riverfront Trail will be enhanced to ADA standards
Implementation of the ADA-compliant Ramp at Beartracks Bridge will create an efficient route for all users from Beartracks Bridge to Caras Park and the Riverfront Trail
Providing a dedicated trail from the Riverfront Trail to Front Street through Kiwanis Park will increase access to popular destinations on Front Street, such as the Missoula Public Library.
MOBILITY: The ease, efficiency, and capability of moving people between destinations.
By widening the riverfront trail, enhancing the connections to the trail, and building an ADA compliant ramp at Beartracks bridge, movement between all points of the downtown area and hip strip are greatly improved.
Click here to return to the full Downtown SAM project.
What are we doing?
Widening Ron’s River Trail from ~Orange Street to ~Bess Reed Park
Enhancing the access to the Riverfront Trail at Ryman Street, Pattee Street, and Kiwanis Park
Constructing a new ADA-compliant ramp on the Northeast side of Beartracks Bridge down to the Riverfront Trail
When are we doing it?
Current stage: DESIGN
currently at a 60% level of detail.
expecting to reach 100% design in Summer 2026.
Construction: TBD
Start of construction: TBD, potentially Fall 2026
Why are we doing it?
The Riverfront Trail and Connectivity Improvements project element enhances safety, access, and mobility along one of Missoula’s most popular corridors. These improvements strengthen multimodal connections between Downtown and the Riverfront Trail system by creating a safer and more accessible experience for all users.
How will this change enhance Downtown Missoula?
SAFETY: Reducing the risk of crashes and increasing the level of comfort for all users traveling to and within downtown.
The extra width will provide more space and comfort for trail users.
The project will add updated trail lighting to improve visibility.
ACCESS: The ease with which people can reach desired goods, services, activities, and destinations using a variety of transportation modes
The trail at the end of Pattee Street leading to the Riverfront Trail will be enhanced to ADA standards
Implementation of the ADA-compliant Ramp at Beartracks Bridge will create an efficient route for all users from Beartracks Bridge to Caras Park and the Riverfront Trail
Providing a dedicated trail from the Riverfront Trail to Front Street through Kiwanis Park will increase access to popular destinations on Front Street, such as the Missoula Public Library.
MOBILITY: The ease, efficiency, and capability of moving people between destinations.
By widening the riverfront trail, enhancing the connections to the trail, and building an ADA compliant ramp at Beartracks bridge, movement between all points of the downtown area and hip strip are greatly improved.
Click here to return to the full Downtown SAM project.
Share Downtown SAM Open House: April 28 on FacebookShare Downtown SAM Open House: April 28 on TwitterShare Downtown SAM Open House: April 28 on LinkedinEmail Downtown SAM Open House: April 28 link
Join us on April 28 from 4:30 - 6:30 p.m. at the Florence Building to learn about design on the Downtown Safety, Access, and Mobility (SAM) project. A presentation will be given at 5:15 p.m. but you are welcome to stop by anytime.
Join us on April 28 from 4:30 - 6:30 p.m. at the Florence Building to learn about design on the Downtown Safety, Access, and Mobility (SAM) project. A presentation will be given at 5:15 p.m. but you are welcome to stop by anytime.
Share Save the Date! First Downtown SAM Open House on FacebookShare Save the Date! First Downtown SAM Open House on TwitterShare Save the Date! First Downtown SAM Open House on LinkedinEmail Save the Date! First Downtown SAM Open House link
Save the date--October 8, 2025 will be the first Downtown SAM Open House.
Drop in any time between 4:30-7:00pm.
Missoula Public Library
Cooper Room B - Level 4
Save the date--October 8, 2025 will be the first Downtown SAM Open House.