Lower Miller Creek Rd Project – Linda Vista Blvd to Jack Dr
Description
Project includes work to improve safety, access, capacity, and mobility on Lower Miller Creek Rd from Linda Vista Blvd to Jack Dr. The project is also planning improvements to Bigfork Rd adjacent to the City’s Maloney Ranch park and Jeannette Rankin Elementary School.
Background
Lower Miller Creek Road from Linda Vista Boulevard to Bigfork Road/Jordan Court is currently a rural two-lane road with minimal shoulder and a 90-degree bend, and it has no lighting, and no pedestrian or bike facilities. Construction of Jeannette Rankin Elementary School and new development in the neighborhood have resulted in additional traffic in the area, increasing the need for safe access to the school for its students as well as safe access for all visitors to the adjacent Maloney Ranch Park. es.
Community Benefits
Improved lighting as well as pedestrian and bike facilities would significantly improve safety for all transportation system users, including those who wish to walk, roll, bike, or drive in and around the area. Installing stormwater facilities extends pavement life and helps to prevent water from pooling in the street and at street corners that becomes ice in the winter.
View the Perspective Renderings
Informational Meeting About the Lower Miller Creek Project
| The City of Missoula Public Works & Mobility Transportation Engineering Division held a public informational meeting on September 29, 2026 for community members to learn about a project to improve safety, access, capacity, and mobility on Lower Miller Creek Rd from Linda Vista Blvd to Jack Dr. The Miller Creek Project is also planning improvements to Bigfork Rd adjacent to the City’s Maloney Ranch Park and Jeannette Rankin Elementary School. |
What is Planned?On Lower Miller Creek Rd from Linda Vista Blvd to Bigfork Rd/Jordan Ct:
At Lower Miller Creek Rd 90-degree corner and intersection with Old Bitterroot Rd:
From the intersection of Bigfork Rd/Jordan Ct to Jack Dr:
On the south side of Big Fork Rd (adjacent to the City's Maloney Ranch Park):
View the Full 90% Plan | ![]()
Click Here to View the |
![]() View the Street Improvements | Project FundingThe total project cost is currently estimated at $5.8 million. The total cost includes preliminary and final design, right-of-way acquisition and cost-to-cure items, utility relocation design and coordination, construction with contingency, construction engineering and administration, and special improvement district creation and administration. Proposed funding sources are City transportation impact fees, private developer contributions, special improvement district (SID) funds, and special impact fee district (SIFD) funds.View the Proposed SID BoundaryThe City entered into a contract with a consultant to assist in the development of an SID for the area. In addition, staff will work with bond council on the SID funding and assessment methodology.Staff is worked with a handful of property owners to secure utility easements so that utility re-location work may begin this summer. See also Lifecycle in column on the right side of this page. |
Description
Project includes work to improve safety, access, capacity, and mobility on Lower Miller Creek Rd from Linda Vista Blvd to Jack Dr. The project is also planning improvements to Bigfork Rd adjacent to the City’s Maloney Ranch park and Jeannette Rankin Elementary School.
Background
Lower Miller Creek Road from Linda Vista Boulevard to Bigfork Road/Jordan Court is currently a rural two-lane road with minimal shoulder and a 90-degree bend, and it has no lighting, and no pedestrian or bike facilities. Construction of Jeannette Rankin Elementary School and new development in the neighborhood have resulted in additional traffic in the area, increasing the need for safe access to the school for its students as well as safe access for all visitors to the adjacent Maloney Ranch Park. es.
Community Benefits
Improved lighting as well as pedestrian and bike facilities would significantly improve safety for all transportation system users, including those who wish to walk, roll, bike, or drive in and around the area. Installing stormwater facilities extends pavement life and helps to prevent water from pooling in the street and at street corners that becomes ice in the winter.
View the Perspective Renderings
Informational Meeting About the Lower Miller Creek Project
| The City of Missoula Public Works & Mobility Transportation Engineering Division held a public informational meeting on September 29, 2026 for community members to learn about a project to improve safety, access, capacity, and mobility on Lower Miller Creek Rd from Linda Vista Blvd to Jack Dr. The Miller Creek Project is also planning improvements to Bigfork Rd adjacent to the City’s Maloney Ranch Park and Jeannette Rankin Elementary School. |
What is Planned?On Lower Miller Creek Rd from Linda Vista Blvd to Bigfork Rd/Jordan Ct:
At Lower Miller Creek Rd 90-degree corner and intersection with Old Bitterroot Rd:
From the intersection of Bigfork Rd/Jordan Ct to Jack Dr:
On the south side of Big Fork Rd (adjacent to the City's Maloney Ranch Park):
View the Full 90% Plan | ![]()
Click Here to View the |
![]() View the Street Improvements | Project FundingThe total project cost is currently estimated at $5.8 million. The total cost includes preliminary and final design, right-of-way acquisition and cost-to-cure items, utility relocation design and coordination, construction with contingency, construction engineering and administration, and special improvement district creation and administration. Proposed funding sources are City transportation impact fees, private developer contributions, special improvement district (SID) funds, and special impact fee district (SIFD) funds.View the Proposed SID BoundaryThe City entered into a contract with a consultant to assist in the development of an SID for the area. In addition, staff will work with bond council on the SID funding and assessment methodology.Staff is worked with a handful of property owners to secure utility easements so that utility re-location work may begin this summer. See also Lifecycle in column on the right side of this page. |
Ask a Question about this Project
Please enter your question below.
-
Share Can the Lower Miller Creek Project boundaries be expanded within Miller Creek to lower the SID & SIFD fees to each household? on Facebook Share Can the Lower Miller Creek Project boundaries be expanded within Miller Creek to lower the SID & SIFD fees to each household? on X (formerly Twitter) Share Can the Lower Miller Creek Project boundaries be expanded within Miller Creek to lower the SID & SIFD fees to each household? on Linkedin Email Can the Lower Miller Creek Project boundaries be expanded within Miller Creek to lower the SID & SIFD fees to each household? link
Can the Lower Miller Creek Project boundaries be expanded within Miller Creek to lower the SID & SIFD fees to each household?
Medora O'Connor asked 7 months agoThank you for your question. We understand the interest in expanding the district to reduce costs for individual property owners.
The proposed Special Improvement District (SID) boundaries reflect the properties expected to benefit from the Lower Miller Creek Road improvements. Expanding the district would require additional review to determine whether other properties receive a direct benefit and could legally share the assessment costs. A larger district would not automatically reduce individual assessments.
The City will continue refining project costs and the proposed assessment methodology before City Council considers creating the SID. You can review the proposed district boundary, funding plan and Sept. 29 presentation on our Engage Missoula project page.
-
Share Hello, I am a homeowner within the SID boundary that was drawn up. It is mentioned that the proposed funding sources are City transportation impact fees, private developer contributions, special improvement district (SID) funds, and special impact fee district (SIFD) funds. Can you elaborate on what percentage of the proposed project budget will be covered by SID funding as this will directly impact the property owners within the boundary. This project also appears to be happening in anticipation of increased traffic from the new residential development and Mormon temple currently under construction along Lower Creek Miller road. I’m curious to understand the tax burden, if any, that will fall on both the Church and the private developers who own the residential construction project and if that information has been made public. Thanks, Connor on Facebook Share Hello, I am a homeowner within the SID boundary that was drawn up. It is mentioned that the proposed funding sources are City transportation impact fees, private developer contributions, special improvement district (SID) funds, and special impact fee district (SIFD) funds. Can you elaborate on what percentage of the proposed project budget will be covered by SID funding as this will directly impact the property owners within the boundary. This project also appears to be happening in anticipation of increased traffic from the new residential development and Mormon temple currently under construction along Lower Creek Miller road. I’m curious to understand the tax burden, if any, that will fall on both the Church and the private developers who own the residential construction project and if that information has been made public. Thanks, Connor on X (formerly Twitter) Share Hello, I am a homeowner within the SID boundary that was drawn up. It is mentioned that the proposed funding sources are City transportation impact fees, private developer contributions, special improvement district (SID) funds, and special impact fee district (SIFD) funds. Can you elaborate on what percentage of the proposed project budget will be covered by SID funding as this will directly impact the property owners within the boundary. This project also appears to be happening in anticipation of increased traffic from the new residential development and Mormon temple currently under construction along Lower Creek Miller road. I’m curious to understand the tax burden, if any, that will fall on both the Church and the private developers who own the residential construction project and if that information has been made public. Thanks, Connor on Linkedin Email Hello, I am a homeowner within the SID boundary that was drawn up. It is mentioned that the proposed funding sources are City transportation impact fees, private developer contributions, special improvement district (SID) funds, and special impact fee district (SIFD) funds. Can you elaborate on what percentage of the proposed project budget will be covered by SID funding as this will directly impact the property owners within the boundary. This project also appears to be happening in anticipation of increased traffic from the new residential development and Mormon temple currently under construction along Lower Creek Miller road. I’m curious to understand the tax burden, if any, that will fall on both the Church and the private developers who own the residential construction project and if that information has been made public. Thanks, Connor link
Hello, I am a homeowner within the SID boundary that was drawn up. It is mentioned that the proposed funding sources are City transportation impact fees, private developer contributions, special improvement district (SID) funds, and special impact fee district (SIFD) funds. Can you elaborate on what percentage of the proposed project budget will be covered by SID funding as this will directly impact the property owners within the boundary. This project also appears to be happening in anticipation of increased traffic from the new residential development and Mormon temple currently under construction along Lower Creek Miller road. I’m curious to understand the tax burden, if any, that will fall on both the Church and the private developers who own the residential construction project and if that information has been made public. Thanks, Connor
Connor Lamping asked 6 months agoThank you for your thoughtful questions, Connor. We understand the importance of knowing how the City will share project costs among existing property owners, new development and other funding sources.
The current $5.8 million project estimate includes a proposed funding mix of 43% impact fees (SIFD paid by new development), 41% SID assessments (paid by current residents withing the SID boundary), and 16% other sources, including developer contributions. Impact fees help fund infrastructure needs associated with new development, reducing the share proposed for existing property owners.
The City also anticipates assessments for nonresidential properties within the proposed SID, including the temple and school. However, individual property assessments and final contributions have not yet been established. The City will refine these amounts as engineering, project costs and the SID assessment methodology advance.
The current schedule anticipates notifying property owners in early 2027, followed by a public hearing and formal written protest period before City Council considers creating the SID.
You can review the Sept. 29 meeting presentation, funding and SID process handout, and proposed district boundary for additional details.
-
Share Why is a taxpayer and homeowner in Linda Vista am I going to be paying a tax increase because church goers want to go to the huge Mormon temple that is being built behind our houses. I for one don’t care and don’t wanna give money to find something that is not needed. Perhaps the temple should’ve been built somewhere else or she just not exist at all. I will be finding whatever petitions exist and signing them and I will be protesting the fact that I will be overpaying on taxes for something that I will never want or use. This project is actually ridiculous. on Facebook Share Why is a taxpayer and homeowner in Linda Vista am I going to be paying a tax increase because church goers want to go to the huge Mormon temple that is being built behind our houses. I for one don’t care and don’t wanna give money to find something that is not needed. Perhaps the temple should’ve been built somewhere else or she just not exist at all. I will be finding whatever petitions exist and signing them and I will be protesting the fact that I will be overpaying on taxes for something that I will never want or use. This project is actually ridiculous. on X (formerly Twitter) Share Why is a taxpayer and homeowner in Linda Vista am I going to be paying a tax increase because church goers want to go to the huge Mormon temple that is being built behind our houses. I for one don’t care and don’t wanna give money to find something that is not needed. Perhaps the temple should’ve been built somewhere else or she just not exist at all. I will be finding whatever petitions exist and signing them and I will be protesting the fact that I will be overpaying on taxes for something that I will never want or use. This project is actually ridiculous. on Linkedin Email Why is a taxpayer and homeowner in Linda Vista am I going to be paying a tax increase because church goers want to go to the huge Mormon temple that is being built behind our houses. I for one don’t care and don’t wanna give money to find something that is not needed. Perhaps the temple should’ve been built somewhere else or she just not exist at all. I will be finding whatever petitions exist and signing them and I will be protesting the fact that I will be overpaying on taxes for something that I will never want or use. This project is actually ridiculous. link
Why is a taxpayer and homeowner in Linda Vista am I going to be paying a tax increase because church goers want to go to the huge Mormon temple that is being built behind our houses. I for one don’t care and don’t wanna give money to find something that is not needed. Perhaps the temple should’ve been built somewhere else or she just not exist at all. I will be finding whatever petitions exist and signing them and I will be protesting the fact that I will be overpaying on taxes for something that I will never want or use. This project is actually ridiculous.
LT199798 asked 22 days agoThank you for sharing your concerns about the project's need and potential costs to homeowners.
The City identified Lower Miller Creek Road improvements years before the temple and nearby residential developments. The project addresses existing transportation needs, including roadway safety, drainage, sidewalks, bike facilities and safer crossings.
The preliminary funding plan assigns 43% of project costs to impact fees (SIFD paid by new development), 41% to SID assessments (current residents in the SID boundary), and 16% to other sources, including developer contributions. These figures remain estimates, and the City has not finalized individual property assessments.
Property owners will have an opportunity to formally protest the proposed SID. The current schedule anticipates mailed notices and a public protest hearing in early 2027. Notices will explain how to submit a written protest and the applicable deadline.
Please feel free to review the Sept. 29 presentation and related materials on our Engage page to learn more about the proposed SID boundary and funding information.
-
Share I'm not paying a dime for this project. In the last 6 years the city has plowed our road once!! Now you want us to pay for a road we never use!! NOT GOING TO HAPPEN! Let the Mormon church pay the cost. on Facebook Share I'm not paying a dime for this project. In the last 6 years the city has plowed our road once!! Now you want us to pay for a road we never use!! NOT GOING TO HAPPEN! Let the Mormon church pay the cost. on X (formerly Twitter) Share I'm not paying a dime for this project. In the last 6 years the city has plowed our road once!! Now you want us to pay for a road we never use!! NOT GOING TO HAPPEN! Let the Mormon church pay the cost. on Linkedin Email I'm not paying a dime for this project. In the last 6 years the city has plowed our road once!! Now you want us to pay for a road we never use!! NOT GOING TO HAPPEN! Let the Mormon church pay the cost. link
I'm not paying a dime for this project. In the last 6 years the city has plowed our road once!! Now you want us to pay for a road we never use!! NOT GOING TO HAPPEN! Let the Mormon church pay the cost.
Retired asked 21 days agoThank you for sharing your concerns about road maintenance and the proposed assessment. We understand that residents want to know why they may need to help fund improvements, especially if they rarely use the road.
The City identified the need to improve Lower Miller Creek Road years before the current developments. The project will address roadway conditions, drainage, sidewalks, pedestrian safety and the sharp intersection at Old Bitterroot Road.
The proposed funding plan includes contributions from development-related sources, not just existing property owners. The City has not yet established the SID or finalized assessments. Property owners will receive formal notice and an opportunity to submit written protests before City Council considers creating the district.
You can review the proposed funding plan, SID boundary and Sept. 29 presentation on our Engage Missoula project page.
-
Share Instead of trees, why are we not adding an additional lane to support major emergency evacuation access out of all these neighborhoods for [not if, but] when wildfire approaches? Thousands of homes and only one way out from this area and we are a spark away from devastating disaster. Why is emergency evacuation not being addressed with this massive project? We don't need trees. We need a way out to survive. on Facebook Share Instead of trees, why are we not adding an additional lane to support major emergency evacuation access out of all these neighborhoods for [not if, but] when wildfire approaches? Thousands of homes and only one way out from this area and we are a spark away from devastating disaster. Why is emergency evacuation not being addressed with this massive project? We don't need trees. We need a way out to survive. on X (formerly Twitter) Share Instead of trees, why are we not adding an additional lane to support major emergency evacuation access out of all these neighborhoods for [not if, but] when wildfire approaches? Thousands of homes and only one way out from this area and we are a spark away from devastating disaster. Why is emergency evacuation not being addressed with this massive project? We don't need trees. We need a way out to survive. on Linkedin Email Instead of trees, why are we not adding an additional lane to support major emergency evacuation access out of all these neighborhoods for [not if, but] when wildfire approaches? Thousands of homes and only one way out from this area and we are a spark away from devastating disaster. Why is emergency evacuation not being addressed with this massive project? We don't need trees. We need a way out to survive. link
Instead of trees, why are we not adding an additional lane to support major emergency evacuation access out of all these neighborhoods for [not if, but] when wildfire approaches? Thousands of homes and only one way out from this area and we are a spark away from devastating disaster. Why is emergency evacuation not being addressed with this massive project? We don't need trees. We need a way out to survive.
Acacia asked about 1 month agoThank you for raising the concern about wildfire evacuation in the Lower Miller Creek area. Emergency access and evacuation are important public-safety considerations, particularly in a neighborhood experiencing growth with constrained access. Here are some key considerations related to your questions:
- The Lower Miller Creek Road project is a reconstruction of a specific segment between Linda Vista Boulevard and Jack Drive. Adding a third travel lane to this segment would not provide a meaningful additional evacuation route because Lower Miller Creek Road remains a two-lane road beyond the project limits. In other words, widening this particular segment would not get residents out of the Lower Miller Creek area any faster.
- Wildfire evacuation was considered during the review and approval of development in this area, including the Riverfront Trails subdivision. Emergency considerations were discussed with City Council and public-safety officials, who indicated that the routes serving the Miller Creek area could be managed to provide for safe and effective evacuation in the event of a wildfire.
- There are known safety tradeoffs to simply making a street like Lower Miller Creek Road wider. This is a residential area with pedestrian and bicycle activity around a school, and wider roadways encourage higher vehicle speeds. Additional lanes also create more conflict points for people crossing or turning to/from the road. Both are contrary to the project's goals of providing a safe, multimodal street in a neighborhood.
- Boulevard trees are not being added instead of emergency access. Trees are a standard component of the City's street design standards and provide benefits including shade, traffic calming, reduced heat, and a more comfortable environment. Street trees are also specifically identified in the Miller Creek Area Comprehensive Plan's design standards.
All considered, the project will improve the overall roadway and access conditions (including emergency access) through roadway reconstruction, improved drainage and lighting, a roundabout at Old Bitterroot Road, and new pedestrian and bicycle facilities. These improvements will make Lower Miller Creek Road a safer, more functional street.
-
Share Anything to slow down the speed racers that like to barrel down the road before they get to Linda Vista? They blow past the bus stop signs as my kids are getting on the bus almost daily and one has to brave traffic crossing at the apartments to even get on the bus. Would be nice not to hear them driving home drunk at Mach 20 as well. on Facebook Share Anything to slow down the speed racers that like to barrel down the road before they get to Linda Vista? They blow past the bus stop signs as my kids are getting on the bus almost daily and one has to brave traffic crossing at the apartments to even get on the bus. Would be nice not to hear them driving home drunk at Mach 20 as well. on X (formerly Twitter) Share Anything to slow down the speed racers that like to barrel down the road before they get to Linda Vista? They blow past the bus stop signs as my kids are getting on the bus almost daily and one has to brave traffic crossing at the apartments to even get on the bus. Would be nice not to hear them driving home drunk at Mach 20 as well. on Linkedin Email Anything to slow down the speed racers that like to barrel down the road before they get to Linda Vista? They blow past the bus stop signs as my kids are getting on the bus almost daily and one has to brave traffic crossing at the apartments to even get on the bus. Would be nice not to hear them driving home drunk at Mach 20 as well. link
Anything to slow down the speed racers that like to barrel down the road before they get to Linda Vista? They blow past the bus stop signs as my kids are getting on the bus almost daily and one has to brave traffic crossing at the apartments to even get on the bus. Would be nice not to hear them driving home drunk at Mach 20 as well.
BL asked about 1 month agoWe hear the concern, particularly when it involves children getting on and off school buses. The Lower Miller Creek project will introduce physical improvements intended to create a safer, more predictable street environment within the project limits, including the new roundabout and pedestrian safety improvements.
The area described east of Linda Vista falls outside the primary limits of this project, so we don't want to imply that the current construction will directly address every speeding location along Lower Miller Creek Road. We will pass this specific concern about speeds, school bus stops and pedestrian crossings along to our Transportation Safety Team. Reports of drivers illegally passing a stopped school bus are also an enforcement issue and should be reported to law enforcement.
-
Share The severe speed problem on Lower Miller Creek Rd doesn’t wait until Linda Vista. As soon as they get off the roundabout on Miller Creek Rd they blast all the way down. I live feet from the road, just before the golf course so I can attest to this happening at all hours. My kids take the bus and people blast through the bus stop sign on the regular, as they’re getting on and off the bus. It’s ridiculous. My older one has to cross to catch the bus and it’s like frogger out there. Speed limits are pointless unless they are enforced and they aren’t down here, at all. Ever. That’s why residents are asking for something tangible to slow traffic, not just “appropriate speed limits” which mean nothing. People seem more concerned about having the loudest muffler and how fast they can take curves down here than human lives. Does it take someone dying on this road for changes to be made? on Facebook Share The severe speed problem on Lower Miller Creek Rd doesn’t wait until Linda Vista. As soon as they get off the roundabout on Miller Creek Rd they blast all the way down. I live feet from the road, just before the golf course so I can attest to this happening at all hours. My kids take the bus and people blast through the bus stop sign on the regular, as they’re getting on and off the bus. It’s ridiculous. My older one has to cross to catch the bus and it’s like frogger out there. Speed limits are pointless unless they are enforced and they aren’t down here, at all. Ever. That’s why residents are asking for something tangible to slow traffic, not just “appropriate speed limits” which mean nothing. People seem more concerned about having the loudest muffler and how fast they can take curves down here than human lives. Does it take someone dying on this road for changes to be made? on X (formerly Twitter) Share The severe speed problem on Lower Miller Creek Rd doesn’t wait until Linda Vista. As soon as they get off the roundabout on Miller Creek Rd they blast all the way down. I live feet from the road, just before the golf course so I can attest to this happening at all hours. My kids take the bus and people blast through the bus stop sign on the regular, as they’re getting on and off the bus. It’s ridiculous. My older one has to cross to catch the bus and it’s like frogger out there. Speed limits are pointless unless they are enforced and they aren’t down here, at all. Ever. That’s why residents are asking for something tangible to slow traffic, not just “appropriate speed limits” which mean nothing. People seem more concerned about having the loudest muffler and how fast they can take curves down here than human lives. Does it take someone dying on this road for changes to be made? on Linkedin Email The severe speed problem on Lower Miller Creek Rd doesn’t wait until Linda Vista. As soon as they get off the roundabout on Miller Creek Rd they blast all the way down. I live feet from the road, just before the golf course so I can attest to this happening at all hours. My kids take the bus and people blast through the bus stop sign on the regular, as they’re getting on and off the bus. It’s ridiculous. My older one has to cross to catch the bus and it’s like frogger out there. Speed limits are pointless unless they are enforced and they aren’t down here, at all. Ever. That’s why residents are asking for something tangible to slow traffic, not just “appropriate speed limits” which mean nothing. People seem more concerned about having the loudest muffler and how fast they can take curves down here than human lives. Does it take someone dying on this road for changes to be made? link
The severe speed problem on Lower Miller Creek Rd doesn’t wait until Linda Vista. As soon as they get off the roundabout on Miller Creek Rd they blast all the way down. I live feet from the road, just before the golf course so I can attest to this happening at all hours. My kids take the bus and people blast through the bus stop sign on the regular, as they’re getting on and off the bus. It’s ridiculous. My older one has to cross to catch the bus and it’s like frogger out there. Speed limits are pointless unless they are enforced and they aren’t down here, at all. Ever. That’s why residents are asking for something tangible to slow traffic, not just “appropriate speed limits” which mean nothing. People seem more concerned about having the loudest muffler and how fast they can take curves down here than human lives. Does it take someone dying on this road for changes to be made?
BL asked about 1 month agoThank you for sharing this. We take concerns about speeding, school bus stops and children crossing Lower Miller Creek Road seriously; and no, we do not want to wait for a serious crash before making safety improvements.
The current project provides several physical changes that support safe speeds. Within the project area, the design adds a mini roundabout, sidewalks, bike facilities, curb and gutter, and improved pedestrian crossings which all contribute in varying degrees to inducing safer, more conscientious driving behavior appropriate in a neighborhood, multimodal environment. The roundabout itself changes the roadway geometry and requires drivers to slow as they approach and travel through the intersection.
We also recognize that the speeding concern described here extends beyond the current project limits, including the stretch toward the existing Miller Creek roundabout. That broader concern deserves attention, but we don't want to suggest this project alone will solve speeding throughout the entire corridor. We will share these comments with our Transportation Safety Team so they can help inform future evaluation of Lower Miller Creek Road.
-
Share Does the upcoming project include the placement of pedestrian activated Rapid Flashing Beacons for the crosswalks at the intersections of Bigfork Road and Jordan CT with Lower Miller Creek Road? Also is there a plan to have a reduced speed limit on Lower Miller Creek Road near Jeannette Rankin School while school is in session? These items would help allow children and other pedestrians safely cross Lower Miller Creek the both the crosswalks at intersections with Jordan CT as well as Bigfork Road. on Facebook Share Does the upcoming project include the placement of pedestrian activated Rapid Flashing Beacons for the crosswalks at the intersections of Bigfork Road and Jordan CT with Lower Miller Creek Road? Also is there a plan to have a reduced speed limit on Lower Miller Creek Road near Jeannette Rankin School while school is in session? These items would help allow children and other pedestrians safely cross Lower Miller Creek the both the crosswalks at intersections with Jordan CT as well as Bigfork Road. on X (formerly Twitter) Share Does the upcoming project include the placement of pedestrian activated Rapid Flashing Beacons for the crosswalks at the intersections of Bigfork Road and Jordan CT with Lower Miller Creek Road? Also is there a plan to have a reduced speed limit on Lower Miller Creek Road near Jeannette Rankin School while school is in session? These items would help allow children and other pedestrians safely cross Lower Miller Creek the both the crosswalks at intersections with Jordan CT as well as Bigfork Road. on Linkedin Email Does the upcoming project include the placement of pedestrian activated Rapid Flashing Beacons for the crosswalks at the intersections of Bigfork Road and Jordan CT with Lower Miller Creek Road? Also is there a plan to have a reduced speed limit on Lower Miller Creek Road near Jeannette Rankin School while school is in session? These items would help allow children and other pedestrians safely cross Lower Miller Creek the both the crosswalks at intersections with Jordan CT as well as Bigfork Road. link
Does the upcoming project include the placement of pedestrian activated Rapid Flashing Beacons for the crosswalks at the intersections of Bigfork Road and Jordan CT with Lower Miller Creek Road? Also is there a plan to have a reduced speed limit on Lower Miller Creek Road near Jeannette Rankin School while school is in session? These items would help allow children and other pedestrians safely cross Lower Miller Creek the both the crosswalks at intersections with Jordan CT as well as Bigfork Road.
Concerned Pedestrian asked about 1 month agoThe project does include Rectangular Rapid Flashing Beacons at the Bigfork/Jordan intersection to enhance safety for pedestrians crossing Lower Miller Creek Rd. While a new school-zone speed limit is not currently included in project plan, City officials are evaluating posted speeds on Lower Miller Creek Rd, including posting a new school zone speed limit independently of this project.
-
Share When do they plan to start work on the new round-a-bout/sidewalks? How long will it take to complete? on Facebook Share When do they plan to start work on the new round-a-bout/sidewalks? How long will it take to complete? on X (formerly Twitter) Share When do they plan to start work on the new round-a-bout/sidewalks? How long will it take to complete? on Linkedin Email When do they plan to start work on the new round-a-bout/sidewalks? How long will it take to complete? link
When do they plan to start work on the new round-a-bout/sidewalks? How long will it take to complete?
Farrel asked about 1 month agoThe current schedule anticipates construction beginning in spring 2027, following the SID process and construction bidding and award. Based on the project scope, the schedule is estimated to last approximately six months (one construction season).
The project schedule remains preliminary, and actual construction timing will depend on finalizing funding sources and actual construction bids. We will continue posting schedule updates through the Engage Missoula project page as those milestones become firm.
-
Share Is the roundabout actually necessary? Shouldn’t we work on another way in and out of miller creek prior to worrying about this traffic issue at this time. on Facebook Share Is the roundabout actually necessary? Shouldn’t we work on another way in and out of miller creek prior to worrying about this traffic issue at this time. on X (formerly Twitter) Share Is the roundabout actually necessary? Shouldn’t we work on another way in and out of miller creek prior to worrying about this traffic issue at this time. on Linkedin Email Is the roundabout actually necessary? Shouldn’t we work on another way in and out of miller creek prior to worrying about this traffic issue at this time. link
Is the roundabout actually necessary? Shouldn’t we work on another way in and out of miller creek prior to worrying about this traffic issue at this time.
Mtdrgdlr asked about 1 month agoWe understand the concern about having additional ways in and out of Miller Creek. The proposed roundabout addresses a different, immediate safety need at the sharp 90-degree intersection of Lower Miller Creek Road and Old Bitterroot Road. The City identified the need for an intersection improvement before the Riverfront Trails development, and the new development accelerated that need. The roundabout will slow traffic through the intersection, decrease conflict points, and provide safer facilities for people walking and biking.
The City continues to evaluate transportation needs across the broader Miller Creek area, but those longer-term network improvements do not eliminate the safety and accessibility needs this project addresses today. The Lower Miller Creek project also fills significant gaps in sidewalks, bike facilities, lighting and storm drainage between Linda Vista Boulevard and Jack Drive.
-
Phone 406-552-6764 Email mollenhauerr@ci.missoula.mt.us -
Phone (406) 552-6678 Email guelffr@ci.missoula.mt.us
-
Lower Miller Creek Plan (90 percent) (31.5 MB) (pdf)
-
LMCR Project Overview Boards (16.2 MB) (pdf)
-
LMCR Street Improvements Options (371 KB) (pdf)
-
LMCR Perspective Renderings (1.14 MB) (pdf)
-
LMCR Project Proposed SID Boundary (4.23 MB) (pdf)
-
LMCR-SID Presentation - 09-26-2026 (2.65 MB) (pdf)
-
LMCR Funding What Property Owners Can Expect (475 KB) (pdf)
-
Preliminary Design — Fall 2023
Lower Miller Creek Rd Project – Linda Vista Blvd to Jack Dr has finished this stage -
Right-of-Way Acquisition - Early 2024-Fall 2025
Lower Miller Creek Rd Project – Linda Vista Blvd to Jack Dr has finished this stage -
Public Outreach — 2024-2026
Lower Miller Creek Rd Project – Linda Vista Blvd to Jack Dr is currently at this stageContinuing to accept public comment on project.
-
Develop Special Improvement District (SID) & Special Impact Fee District (SIFD) — 2024-2026
this is an upcoming stage for Lower Miller Creek Rd Project – Linda Vista Blvd to Jack DrHire consultant to help develop special impact fee district boundaries and methodology.
-
Utility Coordination & Relocation – Early 2024 to Late 2026
this is an upcoming stage for Lower Miller Creek Rd Project – Linda Vista Blvd to Jack Dr -
Finalize Project Design & Funding Sources — Summer/Fall 2026
this is an upcoming stage for Lower Miller Creek Rd Project – Linda Vista Blvd to Jack Dr -
Put Project out to Bid — Late 2026
this is an upcoming stage for Lower Miller Creek Rd Project – Linda Vista Blvd to Jack Dr -
Construction — Early to Late 2027
this is an upcoming stage for Lower Miller Creek Rd Project – Linda Vista Blvd to Jack Dr
-