Lower Miller Creek Rd Project – Linda Vista Blvd to Jack Dr
Description
Project includes work to improve safety, access, capacity, and mobility on Lower Miller Creek Rd from Linda Vista Blvd to Jack Dr. The project is also planning improvements to Bigfork Rd adjacent to the City’s Maloney Ranch park and Jeannette Rankin Elementary School.
Background
Lower Miller Creek Road from Linda Vista Boulevard to Bigfork Road/Jordan Court is currently a rural two-lane road with minimal shoulder and a 90-degree bend, and it has no lighting, and no pedestrian or bike facilities. Construction of Jeannette Rankin Elementary School and new development in the neighborhood have resulted in additional traffic in the area, increasing the need for safe access to the school for its students as well as safe access for all visitors to the adjacent Maloney Ranch Park. es.
Community Benefits
Improved lighting as well as pedestrian and bike facilities would significantly improve safety for all transportation system users, including those who wish to walk, roll, bike, or drive in and around the area. Installing stormwater facilities extends pavement life and helps to prevent water from pooling in the street and at street corners that becomes ice in the winter.
View the Perspective Renderings
Informational Meeting About the Lower Miller Creek Project
| The City of Missoula Public Works & Mobility Transportation Engineering Division held a public informational meeting on September 29, 2026 for community members to learn about a project to improve safety, access, capacity, and mobility on Lower Miller Creek Rd from Linda Vista Blvd to Jack Dr. The Miller Creek Project is also planning improvements to Bigfork Rd adjacent to the City’s Maloney Ranch Park and Jeannette Rankin Elementary School. |
What is Planned?On Lower Miller Creek Rd from Linda Vista Blvd to Bigfork Rd/Jordan Ct:
At Lower Miller Creek Rd 90-degree corner and intersection with Old Bitterroot Rd:
From the intersection of Bigfork Rd/Jordan Ct to Jack Dr:
On the south side of Big Fork Rd (adjacent to the City's Maloney Ranch Park):
View the Full 90% Plan | ![]()
Click Here to View the |
![]() View the Street Improvements | Project FundingThe total project cost is currently estimated at $5.8 million. The total cost includes preliminary and final design, right-of-way acquisition and cost-to-cure items, utility relocation design and coordination, construction with contingency, construction engineering and administration, and special improvement district creation and administration. Proposed funding sources are City transportation impact fees, private developer contributions, special improvement district (SID) funds, and special impact fee district (SIFD) funds.View the Proposed SID BoundaryThe City entered into a contract with a consultant to assist in the development of an SID for the area. In addition, staff will work with bond council on the SID funding and assessment methodology.Staff is worked with a handful of property owners to secure utility easements so that utility re-location work may begin this summer. See also Lifecycle in column on the right side of this page. |
Description
Project includes work to improve safety, access, capacity, and mobility on Lower Miller Creek Rd from Linda Vista Blvd to Jack Dr. The project is also planning improvements to Bigfork Rd adjacent to the City’s Maloney Ranch park and Jeannette Rankin Elementary School.
Background
Lower Miller Creek Road from Linda Vista Boulevard to Bigfork Road/Jordan Court is currently a rural two-lane road with minimal shoulder and a 90-degree bend, and it has no lighting, and no pedestrian or bike facilities. Construction of Jeannette Rankin Elementary School and new development in the neighborhood have resulted in additional traffic in the area, increasing the need for safe access to the school for its students as well as safe access for all visitors to the adjacent Maloney Ranch Park. es.
Community Benefits
Improved lighting as well as pedestrian and bike facilities would significantly improve safety for all transportation system users, including those who wish to walk, roll, bike, or drive in and around the area. Installing stormwater facilities extends pavement life and helps to prevent water from pooling in the street and at street corners that becomes ice in the winter.
View the Perspective Renderings
Informational Meeting About the Lower Miller Creek Project
| The City of Missoula Public Works & Mobility Transportation Engineering Division held a public informational meeting on September 29, 2026 for community members to learn about a project to improve safety, access, capacity, and mobility on Lower Miller Creek Rd from Linda Vista Blvd to Jack Dr. The Miller Creek Project is also planning improvements to Bigfork Rd adjacent to the City’s Maloney Ranch Park and Jeannette Rankin Elementary School. |
What is Planned?On Lower Miller Creek Rd from Linda Vista Blvd to Bigfork Rd/Jordan Ct:
At Lower Miller Creek Rd 90-degree corner and intersection with Old Bitterroot Rd:
From the intersection of Bigfork Rd/Jordan Ct to Jack Dr:
On the south side of Big Fork Rd (adjacent to the City's Maloney Ranch Park):
View the Full 90% Plan | ![]()
Click Here to View the |
![]() View the Street Improvements | Project FundingThe total project cost is currently estimated at $5.8 million. The total cost includes preliminary and final design, right-of-way acquisition and cost-to-cure items, utility relocation design and coordination, construction with contingency, construction engineering and administration, and special improvement district creation and administration. Proposed funding sources are City transportation impact fees, private developer contributions, special improvement district (SID) funds, and special impact fee district (SIFD) funds.View the Proposed SID BoundaryThe City entered into a contract with a consultant to assist in the development of an SID for the area. In addition, staff will work with bond council on the SID funding and assessment methodology.Staff is worked with a handful of property owners to secure utility easements so that utility re-location work may begin this summer. See also Lifecycle in column on the right side of this page. |
Ask a Question about this Project
Please enter your question below.
-
Share There is a lot of new development being made just outside of current city limits to the south along Lower Miller Creek Road – what is being done to ensure those landowners pay their fair share of the proposed project as they will be driving through the subject road system? on Facebook Share There is a lot of new development being made just outside of current city limits to the south along Lower Miller Creek Road – what is being done to ensure those landowners pay their fair share of the proposed project as they will be driving through the subject road system? on X (formerly Twitter) Share There is a lot of new development being made just outside of current city limits to the south along Lower Miller Creek Road – what is being done to ensure those landowners pay their fair share of the proposed project as they will be driving through the subject road system? on Linkedin Email There is a lot of new development being made just outside of current city limits to the south along Lower Miller Creek Road – what is being done to ensure those landowners pay their fair share of the proposed project as they will be driving through the subject road system? link
There is a lot of new development being made just outside of current city limits to the south along Lower Miller Creek Road – what is being done to ensure those landowners pay their fair share of the proposed project as they will be driving through the subject road system?
Brandon Smith asked 11 days agoHi Brandon,
Thanks again for reaching out with your questions. To answer your question, all new development in the Miller Creek area is planned to pay a special impact fee toward the respective fair share of the project’s cost.
-
Share Why wouldn’t the private land developer pay 80-100% of the cost of the proposed roundabout that is across from the Mormon temple where there is a 90-degree turn? That round about specifically benefits the new development and not the current residences who live in Lower Miller Creek. The current residences in the SID are proposed to pay for over 40% of that roundabout are agreeable to simply leave the road as-is with a stop sign from Old Bitterroot Road (new development) coming onto Lower Miller Creek Road. Either the new development (240+ new homes are already approved by the City) need to pay for the vast majority of the roundabout or don’t put one in. The new development didn’t just “accelerate” the need, it obviously accounts for the need and it is outlandish to expect the current homeowners to pay for the roundabout. Please provide detailed traffic analysis with specific citations to the City rationale. The existing round about on Lower Miller Creek to the west of the project in the same neighborhood, across from the fire station was appropriately paid for by a different developer, please articulate why this one is different. on Facebook Share Why wouldn’t the private land developer pay 80-100% of the cost of the proposed roundabout that is across from the Mormon temple where there is a 90-degree turn? That round about specifically benefits the new development and not the current residences who live in Lower Miller Creek. The current residences in the SID are proposed to pay for over 40% of that roundabout are agreeable to simply leave the road as-is with a stop sign from Old Bitterroot Road (new development) coming onto Lower Miller Creek Road. Either the new development (240+ new homes are already approved by the City) need to pay for the vast majority of the roundabout or don’t put one in. The new development didn’t just “accelerate” the need, it obviously accounts for the need and it is outlandish to expect the current homeowners to pay for the roundabout. Please provide detailed traffic analysis with specific citations to the City rationale. The existing round about on Lower Miller Creek to the west of the project in the same neighborhood, across from the fire station was appropriately paid for by a different developer, please articulate why this one is different. on X (formerly Twitter) Share Why wouldn’t the private land developer pay 80-100% of the cost of the proposed roundabout that is across from the Mormon temple where there is a 90-degree turn? That round about specifically benefits the new development and not the current residences who live in Lower Miller Creek. The current residences in the SID are proposed to pay for over 40% of that roundabout are agreeable to simply leave the road as-is with a stop sign from Old Bitterroot Road (new development) coming onto Lower Miller Creek Road. Either the new development (240+ new homes are already approved by the City) need to pay for the vast majority of the roundabout or don’t put one in. The new development didn’t just “accelerate” the need, it obviously accounts for the need and it is outlandish to expect the current homeowners to pay for the roundabout. Please provide detailed traffic analysis with specific citations to the City rationale. The existing round about on Lower Miller Creek to the west of the project in the same neighborhood, across from the fire station was appropriately paid for by a different developer, please articulate why this one is different. on Linkedin Email Why wouldn’t the private land developer pay 80-100% of the cost of the proposed roundabout that is across from the Mormon temple where there is a 90-degree turn? That round about specifically benefits the new development and not the current residences who live in Lower Miller Creek. The current residences in the SID are proposed to pay for over 40% of that roundabout are agreeable to simply leave the road as-is with a stop sign from Old Bitterroot Road (new development) coming onto Lower Miller Creek Road. Either the new development (240+ new homes are already approved by the City) need to pay for the vast majority of the roundabout or don’t put one in. The new development didn’t just “accelerate” the need, it obviously accounts for the need and it is outlandish to expect the current homeowners to pay for the roundabout. Please provide detailed traffic analysis with specific citations to the City rationale. The existing round about on Lower Miller Creek to the west of the project in the same neighborhood, across from the fire station was appropriately paid for by a different developer, please articulate why this one is different. link
Why wouldn’t the private land developer pay 80-100% of the cost of the proposed roundabout that is across from the Mormon temple where there is a 90-degree turn? That round about specifically benefits the new development and not the current residences who live in Lower Miller Creek. The current residences in the SID are proposed to pay for over 40% of that roundabout are agreeable to simply leave the road as-is with a stop sign from Old Bitterroot Road (new development) coming onto Lower Miller Creek Road. Either the new development (240+ new homes are already approved by the City) need to pay for the vast majority of the roundabout or don’t put one in. The new development didn’t just “accelerate” the need, it obviously accounts for the need and it is outlandish to expect the current homeowners to pay for the roundabout. Please provide detailed traffic analysis with specific citations to the City rationale. The existing round about on Lower Miller Creek to the west of the project in the same neighborhood, across from the fire station was appropriately paid for by a different developer, please articulate why this one is different.
Brandon Smith asked 11 days agoHi Brandon,
The existing 90-degree bend at Old Bitterroot Road is an existing roadway deficiency that does not provide a safe or desirable intersection configuration under either current or future conditions. The proposed roundabout is intended to improve safety and traffic operations for the broader neighborhood street network, not solely serve the new development.
The proposed cost allocation is based on existing traffic counts and projected future traffic volumes, with costs distributed in proportion to the transportation demand and benefits associated with each group of users. While future development contributes to the need for the improvement, the roundabout also addresses an existing safety deficiency and will benefit existing neighborhood traffic.
-
Share Why does the proposed transportation project include parking along the east side of Lower Miller Creek Road itself as there is no parking like that in either direction on the same road? That parking would only be needed to accommodate overflow from the new development, including the Mormon temple and if the City decides to keep that upgrade, either the City or the developer (Tollefson) need to pay for that parking lane and not the current Lower Miller Creek homeowners who don’t want or need it. Note that the existing homeowners off Lower Miller Creek Road east, across from the temple already have long and wide driveways and adding a parking lane does not justify the extraordinary expense. on Facebook Share Why does the proposed transportation project include parking along the east side of Lower Miller Creek Road itself as there is no parking like that in either direction on the same road? That parking would only be needed to accommodate overflow from the new development, including the Mormon temple and if the City decides to keep that upgrade, either the City or the developer (Tollefson) need to pay for that parking lane and not the current Lower Miller Creek homeowners who don’t want or need it. Note that the existing homeowners off Lower Miller Creek Road east, across from the temple already have long and wide driveways and adding a parking lane does not justify the extraordinary expense. on X (formerly Twitter) Share Why does the proposed transportation project include parking along the east side of Lower Miller Creek Road itself as there is no parking like that in either direction on the same road? That parking would only be needed to accommodate overflow from the new development, including the Mormon temple and if the City decides to keep that upgrade, either the City or the developer (Tollefson) need to pay for that parking lane and not the current Lower Miller Creek homeowners who don’t want or need it. Note that the existing homeowners off Lower Miller Creek Road east, across from the temple already have long and wide driveways and adding a parking lane does not justify the extraordinary expense. on Linkedin Email Why does the proposed transportation project include parking along the east side of Lower Miller Creek Road itself as there is no parking like that in either direction on the same road? That parking would only be needed to accommodate overflow from the new development, including the Mormon temple and if the City decides to keep that upgrade, either the City or the developer (Tollefson) need to pay for that parking lane and not the current Lower Miller Creek homeowners who don’t want or need it. Note that the existing homeowners off Lower Miller Creek Road east, across from the temple already have long and wide driveways and adding a parking lane does not justify the extraordinary expense. link
Why does the proposed transportation project include parking along the east side of Lower Miller Creek Road itself as there is no parking like that in either direction on the same road? That parking would only be needed to accommodate overflow from the new development, including the Mormon temple and if the City decides to keep that upgrade, either the City or the developer (Tollefson) need to pay for that parking lane and not the current Lower Miller Creek homeowners who don’t want or need it. Note that the existing homeowners off Lower Miller Creek Road east, across from the temple already have long and wide driveways and adding a parking lane does not justify the extraordinary expense.
Brandon Smith asked 11 days agoHi Brandon,
The proposed parallel parking lane is included to meet minimum City street design standards for a community street. It is located adjacent to residential properties and is intended to serve the neighborhood's general needs, not to provide overflow parking for the temple or other new development.
-
Share Why is the Linda Vista Golf course not included within the propose SID boundary of properties that benefit from the project and would contribute funds? The golf course would most certainly “benefit” by having improved access immediately adjacent to their course. In your response, please include a link to the transportation study that specifically addressed this or cite the rationale. The City is missing a key stakeholder who should be paying and thus, reduce the burden to the current homeowners in Lower Miller Creek who are proposed to pay a SID. on Facebook Share Why is the Linda Vista Golf course not included within the propose SID boundary of properties that benefit from the project and would contribute funds? The golf course would most certainly “benefit” by having improved access immediately adjacent to their course. In your response, please include a link to the transportation study that specifically addressed this or cite the rationale. The City is missing a key stakeholder who should be paying and thus, reduce the burden to the current homeowners in Lower Miller Creek who are proposed to pay a SID. on X (formerly Twitter) Share Why is the Linda Vista Golf course not included within the propose SID boundary of properties that benefit from the project and would contribute funds? The golf course would most certainly “benefit” by having improved access immediately adjacent to their course. In your response, please include a link to the transportation study that specifically addressed this or cite the rationale. The City is missing a key stakeholder who should be paying and thus, reduce the burden to the current homeowners in Lower Miller Creek who are proposed to pay a SID. on Linkedin Email Why is the Linda Vista Golf course not included within the propose SID boundary of properties that benefit from the project and would contribute funds? The golf course would most certainly “benefit” by having improved access immediately adjacent to their course. In your response, please include a link to the transportation study that specifically addressed this or cite the rationale. The City is missing a key stakeholder who should be paying and thus, reduce the burden to the current homeowners in Lower Miller Creek who are proposed to pay a SID. link
Why is the Linda Vista Golf course not included within the propose SID boundary of properties that benefit from the project and would contribute funds? The golf course would most certainly “benefit” by having improved access immediately adjacent to their course. In your response, please include a link to the transportation study that specifically addressed this or cite the rationale. The City is missing a key stakeholder who should be paying and thus, reduce the burden to the current homeowners in Lower Miller Creek who are proposed to pay a SID.
Brandon Smith asked 11 days agoHi Brandon,
The proposed SID boundary is based on which properties rely primarily on the Lower Miller Creek Road project segment for transportation access. The Linda Vista Golf Course is east of Linda Vista Boulevard, with primary access from Linda Vista Boulevard and the eastern portion of Lower Miller Creek Road, rather than from the project segment. On that basis, it was not identified as a direct beneficiary within the proposed district.
-
Share Who from the existing homeowners that are subject to the extortionary SID are you hearing from that have expressed support to pay up to $4,500 per home? Note that from the monthly Miller Creek Neighborhood Leadership Team meeting held at the Fire station on November 2, 2026 – members unanimously expressed that the City is unreasonably proposing to assess too small a number of existing homeowners as “benefiting” with the proposed SID at up to $4,500 per home. Miller Creek Leadership accounts for approximately 3,000 homes and the majority of those homes are NOT included in the proposed SID. on Facebook Share Who from the existing homeowners that are subject to the extortionary SID are you hearing from that have expressed support to pay up to $4,500 per home? Note that from the monthly Miller Creek Neighborhood Leadership Team meeting held at the Fire station on November 2, 2026 – members unanimously expressed that the City is unreasonably proposing to assess too small a number of existing homeowners as “benefiting” with the proposed SID at up to $4,500 per home. Miller Creek Leadership accounts for approximately 3,000 homes and the majority of those homes are NOT included in the proposed SID. on X (formerly Twitter) Share Who from the existing homeowners that are subject to the extortionary SID are you hearing from that have expressed support to pay up to $4,500 per home? Note that from the monthly Miller Creek Neighborhood Leadership Team meeting held at the Fire station on November 2, 2026 – members unanimously expressed that the City is unreasonably proposing to assess too small a number of existing homeowners as “benefiting” with the proposed SID at up to $4,500 per home. Miller Creek Leadership accounts for approximately 3,000 homes and the majority of those homes are NOT included in the proposed SID. on Linkedin Email Who from the existing homeowners that are subject to the extortionary SID are you hearing from that have expressed support to pay up to $4,500 per home? Note that from the monthly Miller Creek Neighborhood Leadership Team meeting held at the Fire station on November 2, 2026 – members unanimously expressed that the City is unreasonably proposing to assess too small a number of existing homeowners as “benefiting” with the proposed SID at up to $4,500 per home. Miller Creek Leadership accounts for approximately 3,000 homes and the majority of those homes are NOT included in the proposed SID. link
Who from the existing homeowners that are subject to the extortionary SID are you hearing from that have expressed support to pay up to $4,500 per home? Note that from the monthly Miller Creek Neighborhood Leadership Team meeting held at the Fire station on November 2, 2026 – members unanimously expressed that the City is unreasonably proposing to assess too small a number of existing homeowners as “benefiting” with the proposed SID at up to $4,500 per home. Miller Creek Leadership accounts for approximately 3,000 homes and the majority of those homes are NOT included in the proposed SID.
Brandon Smith asked 11 days agoThanks for reaching out, Brandon,
We recognize that support for the project does not necessarily mean support for the proposed SID or the associated assessment. We understand that the preliminary assessment of up to approximately $4,500 per home is a high cost for affected property owners.
The City has worked to minimize the share assigned to existing properties by accounting for the portion of project demand attributable to future development through special impact fees. We have also evaluated the proposed boundary based on transportation benefit and neighborhood access. Expanding the district to include the broader Miller Creek neighborhood, where properties do not rely on this segment of Lower Miller Creek Road for primary access, would not provide a fair or defensible basis for allocating the project costs.
Ultimately, the SID process is established by state law and includes formal notice, a property-owner protest period, a public hearing, and City Council action before the district can be created. Property owners will have an opportunity to formally protest the proposed SID and share their concerns with their City Council representatives as the process moves forward. The City intends to advance the proposal for consideration, but creation of the SID remains subject to that process and Council action.
-
Share Why would the current residences have to pay a SID for any of the roadwork just south across from Jeanette Rankin Elementary school? That parking is not where any of the residences would ever park, but is literally only needed to accommodate the school’s traffic during drop-off, pick-up, special events at the school, or when there are city sanctioned sporting events at the City’s Maloney Ranch Park immediately adjacent to the south. The City needs to pick up more of the cost and the current residences should not be paying any more than what the City contributes at the very most. And/or, this specific component of the project needs to be paid for by all of the homes that fall within the elementary school district and not just a select few homes. The current road is sufficient for ingress and egress. on Facebook Share Why would the current residences have to pay a SID for any of the roadwork just south across from Jeanette Rankin Elementary school? That parking is not where any of the residences would ever park, but is literally only needed to accommodate the school’s traffic during drop-off, pick-up, special events at the school, or when there are city sanctioned sporting events at the City’s Maloney Ranch Park immediately adjacent to the south. The City needs to pick up more of the cost and the current residences should not be paying any more than what the City contributes at the very most. And/or, this specific component of the project needs to be paid for by all of the homes that fall within the elementary school district and not just a select few homes. The current road is sufficient for ingress and egress. on X (formerly Twitter) Share Why would the current residences have to pay a SID for any of the roadwork just south across from Jeanette Rankin Elementary school? That parking is not where any of the residences would ever park, but is literally only needed to accommodate the school’s traffic during drop-off, pick-up, special events at the school, or when there are city sanctioned sporting events at the City’s Maloney Ranch Park immediately adjacent to the south. The City needs to pick up more of the cost and the current residences should not be paying any more than what the City contributes at the very most. And/or, this specific component of the project needs to be paid for by all of the homes that fall within the elementary school district and not just a select few homes. The current road is sufficient for ingress and egress. on Linkedin Email Why would the current residences have to pay a SID for any of the roadwork just south across from Jeanette Rankin Elementary school? That parking is not where any of the residences would ever park, but is literally only needed to accommodate the school’s traffic during drop-off, pick-up, special events at the school, or when there are city sanctioned sporting events at the City’s Maloney Ranch Park immediately adjacent to the south. The City needs to pick up more of the cost and the current residences should not be paying any more than what the City contributes at the very most. And/or, this specific component of the project needs to be paid for by all of the homes that fall within the elementary school district and not just a select few homes. The current road is sufficient for ingress and egress. link
Why would the current residences have to pay a SID for any of the roadwork just south across from Jeanette Rankin Elementary school? That parking is not where any of the residences would ever park, but is literally only needed to accommodate the school’s traffic during drop-off, pick-up, special events at the school, or when there are city sanctioned sporting events at the City’s Maloney Ranch Park immediately adjacent to the south. The City needs to pick up more of the cost and the current residences should not be paying any more than what the City contributes at the very most. And/or, this specific component of the project needs to be paid for by all of the homes that fall within the elementary school district and not just a select few homes. The current road is sufficient for ingress and egress.
Brandon Smith asked 11 days agoHi Brandon,
The school is included in the proposed SID and will be assigned an assessment proportionate to its share of the projected transportation benefit. Based on the current preliminary calculations, the school will have the largest individual assessment of any property in the district.
The improvements along Bigfork Road were added to the project following neighborhood input in support of their inclusion. While the improvements will help accommodate school-related traffic and activity at Maloney Ranch Park, they also improve safety and access for general neighborhood traffic. The project is intended to address the unique transportation needs along this corridor, rather than simply providing additional parking for school or park events.
We recognize the question of how these costs should be shared, and we are taking steps to ensure assessments are allocated appropriately and fairly based on the benefit provided to properties within the proposed district.
-
Share Why are there streetlights planned to be included the project – there are not any along the Lower Miller Creek Road in either direction? These lights will be an “island of light” and this is a cost that the current homeowners do not want nor or we willing to pay as we don’t have streetlights even on our own streets. on Facebook Share Why are there streetlights planned to be included the project – there are not any along the Lower Miller Creek Road in either direction? These lights will be an “island of light” and this is a cost that the current homeowners do not want nor or we willing to pay as we don’t have streetlights even on our own streets. on X (formerly Twitter) Share Why are there streetlights planned to be included the project – there are not any along the Lower Miller Creek Road in either direction? These lights will be an “island of light” and this is a cost that the current homeowners do not want nor or we willing to pay as we don’t have streetlights even on our own streets. on Linkedin Email Why are there streetlights planned to be included the project – there are not any along the Lower Miller Creek Road in either direction? These lights will be an “island of light” and this is a cost that the current homeowners do not want nor or we willing to pay as we don’t have streetlights even on our own streets. link
Why are there streetlights planned to be included the project – there are not any along the Lower Miller Creek Road in either direction? These lights will be an “island of light” and this is a cost that the current homeowners do not want nor or we willing to pay as we don’t have streetlights even on our own streets.
Brandon Smith asked 11 days agoHi Brandon,
Thanks for your Question about streetlights. Streetlighting has been included in the project as a safety improvement, recognizing its role in reducing the risk of nighttime crashes and improving visibility for all road users, particularly pedestrians and bicyclists. This segment of Lower Miller Creek Road serves as the main, higher-volume community street within the neighborhood, with pedestrian and bicycle activity and crossing movements associated with nearby Jeannette Rankin Elementary School. Those factors make lighting particularly beneficial here. The intent on Lower Miller Creek Rd is not to establish a broader streetlighting network, but to incorporate a safety feature where the roadway use and surrounding activity support the investment.
-
Share Can the Lower Miller Creek Project boundaries be expanded within Miller Creek to lower the SID & SIFD fees to each household? on Facebook Share Can the Lower Miller Creek Project boundaries be expanded within Miller Creek to lower the SID & SIFD fees to each household? on X (formerly Twitter) Share Can the Lower Miller Creek Project boundaries be expanded within Miller Creek to lower the SID & SIFD fees to each household? on Linkedin Email Can the Lower Miller Creek Project boundaries be expanded within Miller Creek to lower the SID & SIFD fees to each household? link
Can the Lower Miller Creek Project boundaries be expanded within Miller Creek to lower the SID & SIFD fees to each household?
Medora O'Connor asked 7 months agoThank you for your question. We understand the interest in expanding the district to reduce costs for individual property owners.
The proposed Special Improvement District (SID) boundaries reflect the properties expected to benefit from the Lower Miller Creek Road improvements. Expanding the district would require additional review to determine whether other properties receive a direct benefit and could legally share the assessment costs. A larger district would not automatically reduce individual assessments.
The City will continue refining project costs and the proposed assessment methodology before City Council considers creating the SID. You can review the proposed district boundary, funding plan and Sept. 29 presentation on our Engage Missoula project page.
-
Share Hello, I am a homeowner within the SID boundary that was drawn up. It is mentioned that the proposed funding sources are City transportation impact fees, private developer contributions, special improvement district (SID) funds, and special impact fee district (SIFD) funds. Can you elaborate on what percentage of the proposed project budget will be covered by SID funding as this will directly impact the property owners within the boundary. This project also appears to be happening in anticipation of increased traffic from the new residential development and Mormon temple currently under construction along Lower Creek Miller road. I’m curious to understand the tax burden, if any, that will fall on both the Church and the private developers who own the residential construction project and if that information has been made public. Thanks, Connor on Facebook Share Hello, I am a homeowner within the SID boundary that was drawn up. It is mentioned that the proposed funding sources are City transportation impact fees, private developer contributions, special improvement district (SID) funds, and special impact fee district (SIFD) funds. Can you elaborate on what percentage of the proposed project budget will be covered by SID funding as this will directly impact the property owners within the boundary. This project also appears to be happening in anticipation of increased traffic from the new residential development and Mormon temple currently under construction along Lower Creek Miller road. I’m curious to understand the tax burden, if any, that will fall on both the Church and the private developers who own the residential construction project and if that information has been made public. Thanks, Connor on X (formerly Twitter) Share Hello, I am a homeowner within the SID boundary that was drawn up. It is mentioned that the proposed funding sources are City transportation impact fees, private developer contributions, special improvement district (SID) funds, and special impact fee district (SIFD) funds. Can you elaborate on what percentage of the proposed project budget will be covered by SID funding as this will directly impact the property owners within the boundary. This project also appears to be happening in anticipation of increased traffic from the new residential development and Mormon temple currently under construction along Lower Creek Miller road. I’m curious to understand the tax burden, if any, that will fall on both the Church and the private developers who own the residential construction project and if that information has been made public. Thanks, Connor on Linkedin Email Hello, I am a homeowner within the SID boundary that was drawn up. It is mentioned that the proposed funding sources are City transportation impact fees, private developer contributions, special improvement district (SID) funds, and special impact fee district (SIFD) funds. Can you elaborate on what percentage of the proposed project budget will be covered by SID funding as this will directly impact the property owners within the boundary. This project also appears to be happening in anticipation of increased traffic from the new residential development and Mormon temple currently under construction along Lower Creek Miller road. I’m curious to understand the tax burden, if any, that will fall on both the Church and the private developers who own the residential construction project and if that information has been made public. Thanks, Connor link
Hello, I am a homeowner within the SID boundary that was drawn up. It is mentioned that the proposed funding sources are City transportation impact fees, private developer contributions, special improvement district (SID) funds, and special impact fee district (SIFD) funds. Can you elaborate on what percentage of the proposed project budget will be covered by SID funding as this will directly impact the property owners within the boundary. This project also appears to be happening in anticipation of increased traffic from the new residential development and Mormon temple currently under construction along Lower Creek Miller road. I’m curious to understand the tax burden, if any, that will fall on both the Church and the private developers who own the residential construction project and if that information has been made public. Thanks, Connor
Connor Lamping asked 7 months agoThank you for your thoughtful questions, Connor. We understand the importance of knowing how the City will share project costs among existing property owners, new development and other funding sources.
The current $5.8 million project estimate includes a proposed funding mix of 43% impact fees (SIFD paid by new development), 41% SID assessments (paid by current residents withing the SID boundary), and 16% other sources, including developer contributions. Impact fees help fund infrastructure needs associated with new development, reducing the share proposed for existing property owners.
The City also anticipates assessments for nonresidential properties within the proposed SID, including the temple and school. However, individual property assessments and final contributions have not yet been established. The City will refine these amounts as engineering, project costs and the SID assessment methodology advance.
The current schedule anticipates notifying property owners in early 2027, followed by a public hearing and formal written protest period before City Council considers creating the SID.
You can review the Sept. 29 meeting presentation, funding and SID process handout, and proposed district boundary for additional details.
-
Share Why is a taxpayer and homeowner in Linda Vista am I going to be paying a tax increase because church goers want to go to the huge Mormon temple that is being built behind our houses. I for one don’t care and don’t wanna give money to find something that is not needed. Perhaps the temple should’ve been built somewhere else or she just not exist at all. I will be finding whatever petitions exist and signing them and I will be protesting the fact that I will be overpaying on taxes for something that I will never want or use. This project is actually ridiculous. on Facebook Share Why is a taxpayer and homeowner in Linda Vista am I going to be paying a tax increase because church goers want to go to the huge Mormon temple that is being built behind our houses. I for one don’t care and don’t wanna give money to find something that is not needed. Perhaps the temple should’ve been built somewhere else or she just not exist at all. I will be finding whatever petitions exist and signing them and I will be protesting the fact that I will be overpaying on taxes for something that I will never want or use. This project is actually ridiculous. on X (formerly Twitter) Share Why is a taxpayer and homeowner in Linda Vista am I going to be paying a tax increase because church goers want to go to the huge Mormon temple that is being built behind our houses. I for one don’t care and don’t wanna give money to find something that is not needed. Perhaps the temple should’ve been built somewhere else or she just not exist at all. I will be finding whatever petitions exist and signing them and I will be protesting the fact that I will be overpaying on taxes for something that I will never want or use. This project is actually ridiculous. on Linkedin Email Why is a taxpayer and homeowner in Linda Vista am I going to be paying a tax increase because church goers want to go to the huge Mormon temple that is being built behind our houses. I for one don’t care and don’t wanna give money to find something that is not needed. Perhaps the temple should’ve been built somewhere else or she just not exist at all. I will be finding whatever petitions exist and signing them and I will be protesting the fact that I will be overpaying on taxes for something that I will never want or use. This project is actually ridiculous. link
Why is a taxpayer and homeowner in Linda Vista am I going to be paying a tax increase because church goers want to go to the huge Mormon temple that is being built behind our houses. I for one don’t care and don’t wanna give money to find something that is not needed. Perhaps the temple should’ve been built somewhere else or she just not exist at all. I will be finding whatever petitions exist and signing them and I will be protesting the fact that I will be overpaying on taxes for something that I will never want or use. This project is actually ridiculous.
LT199798 asked about 1 month agoThank you for sharing your concerns about the project's need and potential costs to homeowners.
The City identified Lower Miller Creek Road improvements years before the temple and nearby residential developments. The project addresses existing transportation needs, including roadway safety, drainage, sidewalks, bike facilities and safer crossings.
The preliminary funding plan assigns 43% of project costs to impact fees (SIFD paid by new development), 41% to SID assessments (current residents in the SID boundary), and 16% to other sources, including developer contributions. These figures remain estimates, and the City has not finalized individual property assessments.
Property owners will have an opportunity to formally protest the proposed SID. The current schedule anticipates mailed notices and a public protest hearing in early 2027. Notices will explain how to submit a written protest and the applicable deadline.
Please feel free to review the Sept. 29 presentation and related materials on our Engage page to learn more about the proposed SID boundary and funding information.
-
Phone 406-552-6764 Email mollenhauerr@ci.missoula.mt.us -
Phone (406) 552-6678 Email guelffr@ci.missoula.mt.us
-
Lower Miller Creek Plan (90 percent) (31.5 MB) (pdf)
-
LMCR Project Overview Boards (16.2 MB) (pdf)
-
LMCR Street Improvements Options (371 KB) (pdf)
-
LMCR Perspective Renderings (1.14 MB) (pdf)
-
LMCR Project Proposed SID Boundary (4.23 MB) (pdf)
-
LMCR-SID Presentation - 09-26-2026 (2.65 MB) (pdf)
-
LMCR Funding What Property Owners Can Expect (475 KB) (pdf)
-
Preliminary Design — Fall 2023
Lower Miller Creek Rd Project – Linda Vista Blvd to Jack Dr has finished this stage -
Right-of-Way Acquisition - Early 2024-Fall 2025
Lower Miller Creek Rd Project – Linda Vista Blvd to Jack Dr has finished this stage -
Public Outreach — 2024-2026
Lower Miller Creek Rd Project – Linda Vista Blvd to Jack Dr is currently at this stageContinuing to accept public comment on project.
-
Develop Special Improvement District (SID) & Special Impact Fee District (SIFD) — 2024-2026
this is an upcoming stage for Lower Miller Creek Rd Project – Linda Vista Blvd to Jack DrHire consultant to help develop special impact fee district boundaries and methodology.
-
Utility Coordination & Relocation – Early 2024 to Late 2026
this is an upcoming stage for Lower Miller Creek Rd Project – Linda Vista Blvd to Jack Dr -
Finalize Project Design & Funding Sources — Summer/Fall 2026
this is an upcoming stage for Lower Miller Creek Rd Project – Linda Vista Blvd to Jack Dr -
Put Project out to Bid — Late 2026
this is an upcoming stage for Lower Miller Creek Rd Project – Linda Vista Blvd to Jack Dr -
Construction — Early to Late 2027
this is an upcoming stage for Lower Miller Creek Rd Project – Linda Vista Blvd to Jack Dr
-
September 29 2026





Thank you for your contribution!
Help us reach out to more people in the community
Share this with family and friends