Phased Development Review: West End Homes Subdivision Ph. 1

CLOSED: This discussion has concluded.

UPDATE: The Phased Development Review request was approved by City Council on November 6th, 2023. This case is now closed for comment.


PROJECT DESCRIPTION:

The subdivider is preparing to file the final plat and create the lots for Phase 1 of the West End Homes Subdivision, approved by City Council on January 9th, 2023. The West End Homes Subdivision is located west of Flynn Lane on Tract E-1 of Certificate of Survey No. 6889 and Tract D of Certificate of Survey No. 6850. Phase 1 includes a large park north of Hellgate Elementary School and 56 lots to be located on England Boulevard. State Law requires City Council to hold a public hearing before each phase of a subdivision proceeds with installation of infrastructure and filing a final plat. City Council will review any changes in regulations or circumstances since approval of preliminary plat for the subdivision. Any new information that may create significant impacts previously not considered by City Council will be considered with the Phased Development Review Process.

No applicable regulations have changed since the preliminary plat approval. There are several pieces of new pieces of information. Some items are identified in the application cover letter while other items have been identified by staff. New information includes:

  • City Engineering secured funding for the trail running along Flynn Lane. Installation of the trail by the developer will no longer be required. Improvements to Flynn Lane are now required with each abutting phase rather than all with Phase 1.
  • The Sxwtpqyen Special Transportation Fee is tied to building permit approval rather than filing of the Phase 1 final plat. This aligns with actual City process.
  • The City is initiating a change to the timing of payment on the Special Sewer and Water fees. This will be handled via agreement, with a possibility of the fee being split between Phase 1 and Phase 2, rather than all with Phase 1. The agreement would go in front of Council for approval.
  • Public Works & Mobility is no longer creating new Special Improvement Lighting Districts (SILD). The related condition of approval would no longer required creation of a SILD, but still will require installation of street lighting on collector streets.
  • An additional trail was initially proposed through the parkland. City plans have been updated to create a better connection between development to the west and Hellgate Elementary School. The trail is no longer planned to be within the subdivision and the subdivider would not be required to install this trail.
  • Bioswales in boulevards were installed with the Mullan BUILD Grant. The developer now would only be required to landscape the bioswales instead of installing the infrastructure.

The property is within the Captain John Mullan Neighborhood Council and City Council Ward 2.


PROJECT APPLICATION LINKS:

The application, preliminary plat, and other materials can be viewed here: https://www.ci.missoula.mt.us/1638/Private-Development-Projects

PROJECT TIMELINE:

The City Council public hearing and final consideration is scheduled for November 6th, 2023 at 6:00 p.m.

The Land Use and Planning Committee pre-public hearing informational meeting is scheduled for October 25th, 2023 (time TBD).

Information on how to attend the meetings virtually or in-person is posted here: https://www.ci.missoula.mt.us/1149/AgendasWebcastsMinutes

PROJECT COMMENT DEADLINE:

Public comment will be taken by City Council until the public hearings are closed. Comments can be submitted through Engage Missoula, via email to the planner noted below, by mailing in a letter to the City of Missoula office at 435 Ryman Street, Missoula, MT 59802, or during the public meeting.

PROJECT PLANNER:

The project planner is Cassie Tripard, who can be reached at TripardC@ci.missoula.mt.us or 406-552-6673.

Categories: Ward 2, Phased Development Review, Neighborhood: Captain John Mullan
Share Phased Development Review: West End Homes Subdivision Ph. 1 on Facebook Share Phased Development Review: West End Homes Subdivision Ph. 1 on Twitter Share Phased Development Review: West End Homes Subdivision Ph. 1 on Linkedin Email Phased Development Review: West End Homes Subdivision Ph. 1 link
<span class="translation_missing" title="translation missing: en-US.projects.blog_posts.show.load_comment_text">Load Comment Text</span>