Minor Subdivision 316 & 320 Expressway - Grant Creek Phase II Lot 22
Share Minor Subdivision 316 & 320 Expressway - Grant Creek Phase II Lot 22 on Facebook Share Minor Subdivision 316 & 320 Expressway - Grant Creek Phase II Lot 22 on Twitter Share Minor Subdivision 316 & 320 Expressway - Grant Creek Phase II Lot 22 on Linkedin Email Minor Subdivision 316 & 320 Expressway - Grant Creek Phase II Lot 22 linkCLOSED: This discussion has concluded.UPDATE: City Council approved the subdivision. This case is now closed for comment.
PROJECT DESCRIPTION:
An application is under review for a two-lot minor subdivision at 316 and 320 Expressway. One additional lot will be created if the subdivision is approved. The parcel currently contains two offices. The subdivision, if approved, will result in each office being on its own separate parcel. City Council may vote to approve, approve with conditions, or deny the request.
Key Dates:
Land Use and Planning Committee: December 14th, 2022 (time TBD)
City Council: December 19th, 2022 6:00 pm
PROJECT COMMENT DEADLINE:
Public comment will be taken by City Council until the public meeting are closed. Comments can be submitted through Engage Missoula, via email to the planner noted below, by mailing in a letter to the City of Missoula office at 435 Ryman Street, Missoula, MT 59802, or during the public meetings. Provide your comment by Friday, December 5th, 2022, to be included in the staff report provided to City Council.
PROJECT PLANNER:
The project planner is Spencer Starke. They can be reached at (406) 552-6671 or Starkes@ci.missoula.mt.us.
Important Links:
City Private Development Page – Full Application Packet https://www.ci.missoula.mt.us/2947/Grant-Creek-Center-Phase-II-Lots-22A-Lot
Public Meeting Agenda – How to Attend Virtual Meetings https://www.ci.missoula.mt.us/1149/AgendasWebcastsMinutes
-
Variance Request: Montana Food Bank Network
Share Variance Request: Montana Food Bank Network on Facebook Share Variance Request: Montana Food Bank Network on Twitter Share Variance Request: Montana Food Bank Network on Linkedin Email Variance Request: Montana Food Bank Network linkCLOSED: This discussion has concluded.UPDATE: On November 29, 2022 Board of Adjustment approved the variance requests. This case is now closed for comment.
PROJECT DESCRIPTION:
A public hearing was scheduled for October 26th, 2022 however a quorum was not met. The Board of Adjustment has called a Special Meeting for November 29th, 2022 to hear the variance requests of the Montana Food Bank Network. Staff are re-noticing the project for the upcoming hearing. No changes have been made to the application packet. Agency comments submitted during the first agency comment period are included in the staff report.
Development Services has received a request from Luke Jackson with Loci Architecture & Design on behalf of the Montana Food Bank Network, for variances from the building height, front yard setback, parking and drive surface setback from property line, and parking and drive surface setback from building requirements of the Missoula Development Park Overlay for the property legally described as Lot 2 & Lot 5 in Maggie Jax Subdivision, Section 36, Township 14 North, Range 20 West, P.M.M. The applicant is requesting these variances as part of a proposal to construct a Montana Food Bank distribution warehouse to meet current and immediate food distribution needs across the state of Montana. These variance requests are in response to the property existing on a steep slope creating 114,836 square feet of no build-area.
PROJECT APPLICATION LINKS:
The application packet can be viewed here: https://www.ci.missoula.mt.us/1638/Private-Development-Projects
PROJECT TIMELINE:
The public hearing will be held by the Board of Adjustment on Tuesday, November 29th, 2022, at 6:00 pm.
Information on how to attend the meeting virtually via Microsoft Teams and whether a hybrid or in-person option is available can be found online at: https://www.ci.missoula.mt.us/1149/AgendasWebcastsMinutes
PROJECT COMMENT DEADLINE:
Public comment will be taken until the public hearing is closed. Comments can be submitted through Engage Missoula, via email to the planner noted below, by mailing in a letter to the City of Missoula office at 435 Ryman Street, Missoula, MT 59802, or during the Board of Adjustment public meeting on November 29th, 2022, at 6:00pm. Your comments may be considered by the Board of Adjustment in their decision to approve or deny this request.
PROJECT PLANNER:
The project planner is Zoe Walters and can be reached at 406-552-6399 or waltersz@ci.missoula.mt.us.
1 comment
-
1725 Cooper Street 5-unit TED
Share 1725 Cooper Street 5-unit TED on Facebook Share 1725 Cooper Street 5-unit TED on Twitter Share 1725 Cooper Street 5-unit TED on Linkedin Email 1725 Cooper Street 5-unit TED linkCLOSED: This discussion has concluded.UPDATE: The 15-day notification period has ended. The Zoning Compliance Permit is approved and this case is now closed for comment.
Townhome Exemption Development Required Notification - Application No: 2022-MSS-ZCP-00020
The City of Missoula Development Services has received a Zoning Compliance Permit from Marisa Kramer of Paradigm Architecture on behalf of the property owner, Cooper Street Group LLC, for a Townhouse Exemption Development (TED) located at 1725 Cooper Street, legally described as Lots 5 and 6, and a portion of Lot 7 of Block 85 in the School Addition, in Section 16, Township 13 North, Range 19 West. An exhibit of the location is provided below.
The project consists of five (5) TED ownership units, one detached house and two two-unit townhouses. The proposed site plan is included with this letter.
Title 20, Section 20.05.040.D.4 requires that all TED projects of more than five (5) dwelling units be notified by mail to all owners of property within 150 feet of the subject parcel at least fifteen (15) days before a zoning compliance permit is issued.
The purpose of this notification is to make you aware of this permit request in your neighborhood. This development is a permitted use, and no public hearing is required for its approval. Please contact Development Services if you need further information, telephone (406) 552-6625, or by email to cityzoner@ci.missoula.mt.us. You can also comment on this project at https://www.engagemissoula.com/development-applications.
-
Request for Extension to Meet Conditions of Annexation at 3719, 3721, & 3723 Grant Creek Road
Share Request for Extension to Meet Conditions of Annexation at 3719, 3721, & 3723 Grant Creek Road on Facebook Share Request for Extension to Meet Conditions of Annexation at 3719, 3721, & 3723 Grant Creek Road on Twitter Share Request for Extension to Meet Conditions of Annexation at 3719, 3721, & 3723 Grant Creek Road on Linkedin Email Request for Extension to Meet Conditions of Annexation at 3719, 3721, & 3723 Grant Creek Road linkCLOSED: This discussion has concluded.UPDATE: On December 5, 2022 City Council approved the extension to meet conditions of annexation. This case is now closed for comment.
PROJECT DESCRIPTION:
At the request of property owner Diversified Real Estate, LLC, on December 13, 2021 the Missoula City Council annexed into city limits three parcels of land addressed as 3719, 3721, and 3723 Grant Creek Road located east of North Reserve Street at the intersection of Grant Creek Road and Howard Raser Drive.
The property is home to Diversified Plastics, a custom plastics fabrication and engineering company that is expanding its workforce and facilities to meet growing demand. The property is located in the North Reserve - Scott Street Master Plan Area and Urban Renewal District.
The annexation is subject to six conditions of approval. On behalf of the property owner, IMEG Corporation has requested a two-year extension to annexation conditions #1 and #2, which require curb, gutter, and street improvements to Howard Raser Drive and Grant Creek Road prior to occupancy of a new building addition or within one year, whichever comes first. The building addition is not yet complete and the one-year period will expire on December 13, 2022. The extension request states the timeline for project completion has been delayed due to a number of limitations including building permit review, construction materials limitations, and negotiations for tax increment financing assistance through the Missoula Redevelopment Agency.
PROJECT APPLICATION LINKS:
The application packet can be viewed here: https://www.ci.missoula.mt.us/1638/Private-Development-Projects
PROJECT TIMELINE:
City Council: Monday November 14, 2022 at 6:00 p.m. – Set Public Hearing and Referral to the Land Use and Planning Committee - Consent Agenda.
City Council: Monday November 28, 2022 at 6:00 pm – City Council public hearing.
Land Use and Planning Committee: Wednesday November 30, 2022 (time TBD) – Post-public hearing informational item.
City Council: Monday December 5th, 2022 at 6:00 pm – City Council final consideration on Resolution to Amend Conditions of Annexation
All meetings will be held virtually, with more information to be posted here: https://www.ci.missoula.mt.us/1149/AgendasWebcastsMinutes
PUBLIC COMMENT DEADLINE:
Public comment will be taken by City Council until the close of the November 30, 2022 Land Use and Planning Committee meeting. Comments can be submitted through Engage Missoula, via email to the planner noted below, by mailing in a letter to the City of Missoula Community Planning, Development, and Innovation office at 435 Ryman Street Missoula, MT 59802, or orally during the public meetings. Comments may be considered by City Council in its decision to approve or deny this request.
PROJECT PLANNER:
The project planner is Dave DeGrandpre. Dave can be reached at 406-529-0709 or degrandpred@ci.missoula.mt.us.
-
Phased Development Review – Remington Flats Subdivision Phase 2 and 3
Share Phased Development Review – Remington Flats Subdivision Phase 2 and 3 on Facebook Share Phased Development Review – Remington Flats Subdivision Phase 2 and 3 on Twitter Share Phased Development Review – Remington Flats Subdivision Phase 2 and 3 on Linkedin Email Phased Development Review – Remington Flats Subdivision Phase 2 and 3 linkCLOSED: This discussion has concluded.UPDATE: On April 18th, 2022 City Council approved the phased development review of Phases 2 and 3 of Remington Flats Subdivision with amended findings of fact and conditions of approval.
PROJECT DESCRIPTION:
The subdivider is preparing to file the final plat and create the lots for Phase 2 and 3 of the Remington Flats Subdivision approved by City Council on October 19, 2020. Remington Flats Subdivision is located east of Chuck Wagon Drive just north of 44 Ranch Subdivision in the Captain John Mullan Neighborhood Council area. State Law requires City Council to hold a public hearing before each phase of a subdivision proceeds to filing a final plat. City Council will review any changes in regulation or whether there is new information that may create significant adverse impacts for each phase that differs from what City Council considered at preliminary plat approval for the subdivision. Phase 2 and 3 are the second and third phases proceeding to final plat filing. The final plat for Phase 1 of Remington Flats Subdivision has been submitted for City staff review following City Council Phased Development Review approval on January 25, 2021.
PROJECT APPLICATION LINKS:
The application, preliminary plat, and other materials can be viewed here: https://www.ci.missoula.mt.us/1638/Private-Development-Projects
PROJECT TIMELINE:
The City Council public hearing is scheduled for April 18, 2022 at 6:00 p.m.
The Land Use and Planning Committee post-public hearing informational meeting is scheduled for April 13, 2022 (time TBD).
The City Council final consideration is scheduled for April 18, 2022 at 6:00 p.m.
Information on how to attend the meetings virtually and whether a hybrid or in-person option is available is posted here: https://www.ci.missoula.mt.us/1149/AgendasWebcastsMinutes
PROJECT COMMENT DEADLINE:
Public comment will be taken by City Council until the public hearings are closed. Comments can be submitted through Engage Missoula, via email to the planner noted below, by mailing in a letter to the City of Missoula office at 435 Ryman Street, Missoula, MT 59802, or during the public meeting. Provide your comment by Monday, April 4th, 2022, to be included in the staff report provided to City Council.
PROJECT PLANNER:
The project planner is Dave DeGrandpre, who can be reached at degrandpred@ci.missoula.mt.us or 406-552-6633.
-
Phased Development Review - Heron's Landing Subdivision Phase W2 and Phase E1
Share Phased Development Review - Heron's Landing Subdivision Phase W2 and Phase E1 on Facebook Share Phased Development Review - Heron's Landing Subdivision Phase W2 and Phase E1 on Twitter Share Phased Development Review - Heron's Landing Subdivision Phase W2 and Phase E1 on Linkedin Email Phased Development Review - Heron's Landing Subdivision Phase W2 and Phase E1 linkCLOSED: This discussion has concluded.UPDATE: On April 18th, 2022 City Council approved the phased development review of Phases W2 and E1 of Heron's Landing Subdivision with amended findings of fact and conditions of approval.
PROJECT DESCRIPTION:
The subdivider is preparing to file the final plat and create the lots for Phase W2 and E1 of the Heron’s Landing Subdivision approved by City Council on September 21, 2020. Heron’s Landing Subdivision is located north of Mullan Road along both sides of George Elmer Drive in the Captain John Mullan Neighborhood Council area. State Law requires City Council to hold a public hearing before each phase of a subdivision proceeds to filing a final plat. City Council will review any changes in regulation or whether there is new information that may create significant adverse impacts for each phase that differs from what City Council considered at preliminary plat approval for the subdivision. Phase W2 and E1 are the second and third phases proceeding to final plat filing. Phase W1 of Heron’s Landing Subdivision was filed on September 23, 2021.
PROJECT APPLICATION LINKS:
The application, preliminary plat, and other materials can be viewed here: https://www.ci.missoula.mt.us/1638/Private-Development-Projects(External link)
PROJECT TIMELINE:
The City Council public hearing is scheduled for April 11, 2022 at 6:00 p.m.
The Land Use and Planning Committee post-public hearing informational meeting is scheduled for April 13, 2022 (time TBD).
The City Council final consideration is scheduled for April 18, 2022 at 6:00 p.m.
Information regarding how to attend the meetings virtually and whether a hybrid or in-person option is available is posted here: https://www.ci.missoula.mt.us/1149/AgendasWebcastsMinutes
PROJECT COMMENT DEADLINE:
Public comment will be taken by City Council until the public hearings are closed. Comments can be submitted through Engage Missoula, via email to the planner noted below, by mailing in a letter to the City of Missoula office at 435 Ryman Street, Missoula, MT 59802, or during the public meeting. Provide your comment by Monday, April 4th, 2022, to be included in the staff report provided to City Council.
PROJECT PLANNER:
The project planner is Dave DeGrandpre, who can be reached at degrandpred@ci.missoula.mt.us(External link) or 406-552-6633.
-
Administrative Adjustment: Parcel Area for Additional Dwelling Unit at 3705 & 3715 England Blvd.
Share Administrative Adjustment: Parcel Area for Additional Dwelling Unit at 3705 & 3715 England Blvd. on Facebook Share Administrative Adjustment: Parcel Area for Additional Dwelling Unit at 3705 & 3715 England Blvd. on Twitter Share Administrative Adjustment: Parcel Area for Additional Dwelling Unit at 3705 & 3715 England Blvd. on Linkedin Email Administrative Adjustment: Parcel Area for Additional Dwelling Unit at 3705 & 3715 England Blvd. linkCLOSED: This discussion has concluded.UPDATE: On March 30, 2022 the Zoning Officer approved the administrative adjustment for parcel area for one additional unit. This case is now closed for comment.
PROJECT DESCRIPTION:
The City of Missoula Development Services has received a request from Mike Morgan of Hoffmann-Morgan Associates, representing the owner of the property addressed 3705 and 3715 England Boulevard, for an Administrative Adjustment to increase the number of dwelling units allowed from seventy-five (75) to seventy-six (76) units. Title 20, Section 20.85.110.B.7 authorizes the zoning officer to approve an administrative adjustment to permit the construction of one (1) additional residential dwelling unit on a parcel that would otherwise be prohibited solely because the parcel does not comply with the minimum parcel area standards of the subject zoning district. A request can be made for an adjustment only if the existing parcel area is at least 95% of the required minimum area.
The subject property is zoned B2-2 (Community Business), which requires 1,000 square feet of parcel area per dwelling unit. The property is 75,359 square feet or 99.2% of the required 76,000 square feet needed for seventy-six (76) dwelling units.
This is an administrative action which does not require a public hearing. However, property owners within 150 feet of the subject property are notified and provided the opportunity to submit public comment. Staff will issue a report on compliance with the review criteria of Title 20, Section 20.85.110.F. The Zoning Officer may either approve, approve with conditions, deny, or refer the request to Board of Adjustment for a decision.
The subject property is located in the Captain John Mullan Neighborhood Council.
PROJECT APPLICATION LINKS:
The application packet can be viewed here: https://www.ci.missoula.mt.us/DocumentCenter/View/60181/Administrative-adjustment-3705-and-3715
PROJECT TIMELINE:
15-Day Noticing Period: March 14-29, 2022
Administrative Action: March 30, 2022
PROJECT COMMENT DEADLINE:
Public comment will be taken by staff until the 15-day noticing period is closed. Comments can be submitted through Engage Missoula, via email to the planner noted below, or by mailing in a letter to the City of Missoula office at 435 Ryman Street, Missoula, MT 59802. Provide your comment by Tuesday, March 29, 2022 to be included in the staff report prepared by staff.
PROJECT PLANNER:
The project planner is Lauren Stevens. She can be reached at (406) 552-6054 or stevensl@ci.missoula.mt.us.
-
Annexation and Zoning Upon Annexation of 3719, 3721, and 3723 Grant Creek Road
Share Annexation and Zoning Upon Annexation of 3719, 3721, and 3723 Grant Creek Road on Facebook Share Annexation and Zoning Upon Annexation of 3719, 3721, and 3723 Grant Creek Road on Twitter Share Annexation and Zoning Upon Annexation of 3719, 3721, and 3723 Grant Creek Road on Linkedin Email Annexation and Zoning Upon Annexation of 3719, 3721, and 3723 Grant Creek Road linkCLOSED: This discussion has concluded.UPDATE: On December 13th, 2021 City Council adopted the resolution to annex this property. This case is now closed for comment.
PROJECT DESCRIPTION:
The City of Missoula is reviewing a petition from Diversified Plastics, Inc. to annex the three parcels addressed 3719, 3721, and 3723 Grant Creek Road located at the corner of Grant Creek Road and Howard Raser Drive into city limits. The parcels are a combined 3.32 acres. The existing Missoula County zoning of the subject property is C-I2 Heavy Industry, and the proposed city zoning upon annexation is M1-2 Limited Industrial.
The three properties currently contain four existing buildings in which general manufacturing activities take place, including urethane manufacturing and injection molding. Following the proposed annexation, the applicant intends to construct a building addition that connects two buildings on the two northern parcels, as well as improvements to the parking area on the site, including the provision of 47 parking spaces and landscaping. The applicant requests annexation into city limits in order to allow the site to have access to city water and sewer.
PROJECT APPLICATION LINKS:
The application packet can be viewed here: https://www.ci.missoula.mt.us/1638/Private-Development-Projects
PROJECT TIMELINE:
City Council: November 29th, 2021, Adopt Resolution of Intent, Set Public Hearing and Referral to LUP on Consent Agenda.
City Council: Monday December 6th, 2021, at 6:00 pm – City Council public hearing.
Land Use and Planning Committee: Wednesday December 8th, 2021 (Time TBD) – Post-public hearing informational item.
City Council: Monday December 13th, 2021, at 6:00 pm – Final Consideration on Resolution to Annex
All meetings will be held virtually, with more information to be posted here: https://www.ci.missoula.mt.us/1149/AgendasWebcastsMinutes
PROJECT COMMENT DEADLINE:
Public comment will be taken by City Council until the public hearings are closed. Comments can be submitted through Engage Missoula, via email to the planner noted below, by mailing in a letter to the City of Missoula office at 435 Ryman Street, Missoula, MT 59802, or during the public meetings. Provide your comment by Monday November 15th, 2021, to be included in the staff report provided to City Council. Your comments may be considered by Planning Board and City Council in their decision to approve or deny this request.
PROJECT PLANNER:
The project planner is Emily Gluckin. She can be reached at 406-552-6621 or gluckine@ci.missoula.mt.us.
-
Annexation & Zoning Upon Annexation: England Boulevard Annexation
Share Annexation & Zoning Upon Annexation: England Boulevard Annexation on Facebook Share Annexation & Zoning Upon Annexation: England Boulevard Annexation on Twitter Share Annexation & Zoning Upon Annexation: England Boulevard Annexation on Linkedin Email Annexation & Zoning Upon Annexation: England Boulevard Annexation linkCLOSED: This discussion has concluded.UPDATE: On September 20th, 2021 City Council adopted the resolution to annex this property. This case is now closed for comment.
PROJECT DESCRIPTION:
An application is under review for an annexation and zoning upon annexation of two parcels off of England Boulevard, between Connery Way and Tina Avenue. The parcels are a combined 75,358.60 square feet and the property is legally described as Lots 3A and Charlies Addition Number 1, located in the South ½ of Section 7, Township 13 North, Range 19 West, Block 2 and Certificate of Survey 4623, P.M.M. If approved, this project would wove the property from the County into the City. The existing Missoula County zoning of the subject property is C-C2, General Commercial, and the proposed City zoning to be issued upon annexation is B2-2, Community Business.
PROJECT APPLICATION LINKS:
The application packet can be viewed here: https://www.ci.missoula.mt.us/1638/Private-Development-Projects
PROJECT TIMELINE:
City Council: August 23rd, 2021 at 6:00 pm – City Council consent agenda/Council refers item to Land Use and Planning Committee
City Council: September 13th, 2021 at 6:00 pm – City Council public hearing
Land Use & Planning Committee: September 15th, 2021 time TBD – Informational meeting only
City Council: September 20th, 2021 at 6:00 pm – City Council final consideration
All meetings will be held virtually via Zoom, with more information posted here:
https://www.ci.missoula.mt.us/1149/AgendasWebcastsMinutes
PROJECT COMMENT DEADLINE:
Public comment will be taken by City Council until the public hearings are closed. Comments can be submitted through Engage Missoula, via email to the planner noted below, by mailing in a letter to the City of Missoula office at 435 Ryman Street, Missoula, MT 59802, or during the public meeting. Provide your comment by Monday, August 23rd, 2021, to be included in the staff report provided to City Council.
PROJECT PLANNER:
The project planner is Kaitlin McCafferty. She can be reached at (406) 552-6085, or McCaffertyK@ci.missoula.mt.us.
-
Rezoning: Defoe and Burton Street
Share Rezoning: Defoe and Burton Street on Facebook Share Rezoning: Defoe and Burton Street on Twitter Share Rezoning: Defoe and Burton Street on Linkedin Email Rezoning: Defoe and Burton Street linkCLOSED: This discussion has concluded.UPDATE: On April 12th, 2020 City Council adopted the ordinance to rezone this property. This case is now closed for comment.
PROJECT DESCRIPTION
An application is under review to rezone the subject properties located at 1315, 1319, 1321, 1321 ½, 1323, 1325, and 1327 Defoe Street, 1127 and 1131 Shakespeare Street, and 1120 Burton Street legally described as Lots 1-10 in Block 61 of the School Addition, located in Section 16, Township 13 North, Range 19 West, P.M.M. from RT2.7 Residential to B1-1 Neighborhood Commercial. This rezone would result in a standard zoning district in Title 20 and may not be conditioned.
The applicant makes this request in anticipation of twenty-four (24) new residential dwelling units.
PROJECT APPLICATION LINKS
The application packet can be viewed here: https://www.ci.missoula.mt.us/DocumentCenter/View/55459/Application-Defoe-Shakespeare-Burton
PROJECT TIMELINE
The Planning Board public hearing is scheduled for March 16th, 2021 at 6:00 p.m.
The Land Use and Planning Committee informational meeting is scheduled for March 31st, 2021 (time TBD)
The City Council public hearing is scheduled for April 5th, 2021 at 6:00 p.m.
All meetings will be held via Zoom, with more information to be posted here: https://www.ci.missoula.mt.us/1149/AgendasWebcastsMinutes
PROJECT COMMENT DEADLINE
Public comment will be taken by City Council until the public hearings are closed. Comments can be submitted through Engage Missoula, via email to the planner noted below, by mailing in a letter to the City of Missoula office at 435 Ryman Street, Missoula, MT 59802, or during the public meeting. Provide your comment by March 5th, 2021, to be included in the staff report provided to the Planning Board. Your comments may be considered by the Planning Board and City Council in their decision to approve or deny this request.
PROJECT PLANNER
The project planner is Alex Eidam. She can be reached at 552-3437, or eidama@ci.missoula.mt.us.